Drolet ECO-45 Spécifications

Naviguer en ligne ou télécharger Spécifications pour Poêles Drolet ECO-45. Drolet ECO-45 Specifications Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 102
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
READ AND KEEP THIS MANUAL FOR REFERENCE
45725A
Printed in Canada 03-06-2014
Installation and Operation Manual
Eco-65
Safety tested according to ULC S627,
UL1482 and ASTM E1509 by
Intertek Testing Services.
INSTALLATION BY A
PROFESSIONAL IS STRONGLY
RECOMMENDED
Fabricant de poêles international inc.
250, rue de Copenhague, St-Augustin-de-
Desmaures (Québec) Canada G3A 2H3
Téléphone : (418) 878-3040
Télécopieur : (418) 878-3001
www.drolet.ca
CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND
INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA.
PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS
PELLET FUEL-BURNING ROOM HEATER. FAILURE TO FOLLOW THESE
INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE, BODILY INJURY OR
EVEN DEATH.
This manual is available for free download on the manufacturer’s web site. It is a
copyrighted document. Re-sale is strictly prohibited. The manufacturer may update this
manual from time to time and cannot be responsible for problems, injuries, or damages
arising out of the use of information contained in any manual obtained from unauthorized
sources.
Vue de la page 0
1 2 3 4 5 6 ... 101 102

Résumé du contenu

Page 1 - RECOMMENDED

READ AND KEEP THIS MANUAL FOR REFERENCE 45725A Printed in Canada 03-06-2014 Installation and Operation Manual Eco-65 Safety tested according to U

Page 2

Eco-65 Installation and Operation Manual 10 2.2 Regulations Covering Pellet Stove Installation When installed and operated as described in these

Page 3 - Table of contents

Eco-65 Installation and Operation Manual 100 APPENDIX F: OPTIONAL HOT AIR DISTRIBUTION KIT (AC01330) The hot air distribution kit AC01330 is avail

Page 4

Eco-65 Installation and Operation Manual 101 This hot air plenum kit contains the following parts: (A) -49068 2x (B) -PL62444 1x (C) -SE62443 1

Page 5 - 1 Introduction

Eco-65 Installation and Operation Manual 102 DROLET LIMITED LIFETIME WARRANTY The warranty of the manufacturer extends only to the original consum

Page 6 - 1.2 Eco-65 Specifications

Eco-65 Installation and Operation Manual 11 2.3 Before Operating Your Stove Some minor installation and adjustment are required prior to use: 

Page 7 - EXHAUST

Eco-65 Installation and Operation Manual 12 3 Clearances to Combustible Material The clearances shown in this section have been determined by tes

Page 8 - PART A – INSTALLATION

Eco-65 Installation and Operation Manual 13 3.3 Floor Protection For floor protection clearances refer to the following table. FLOOR PROT

Page 9

Eco-65 Installation and Operation Manual 14 4 Venting system 4.1 General Even though the chimney draft is mechanical, a suitable venting system wi

Page 10

Eco-65 Installation and Operation Manual 15  2 horizontal run of 1’ = (2 X 1’) X 1’ = 2’ of EVL  1 elbow 90° or "Tee" = 5’ of EVL 

Page 11

Eco-65 Installation and Operation Manual 16 WARNING: To reduce the risk of smoke spillage there should always be at least one foot of vertical ris

Page 12

Eco-65 Installation and Operation Manual 17 4.4.1 Permitted Termination Location Refer to NFPA 211 (USA) or CSA B365 (Canada) for rules for the di

Page 13 - 3.3 Floor Protection

Eco-65 Installation and Operation Manual 18 United States:  Not Less than 36’’ (91 cm) above any forced air inlet located within 10 feet (305 cm

Page 14 - 4 Venting system

Eco-65 Installation and Operation Manual 19 4.5.2 Through Wall Installation (Main Floor or Basement) 1. Position stove following clearances gi

Page 15

Eco-65 Installation and Operation Manual 2 THANK YOU FOR CHOOSING THIS DROLET PELLET STOVE As one of North America’s largest and most respected pe

Page 16 - 4.4 Termination Location

Eco-65 Installation and Operation Manual 20 4.5.3 Through Roof Installation 1. Position stove following clearances given in Section 3.2: Minimum

Page 17

Eco-65 Installation and Operation Manual 21 4.5.4 Through a Factory Built Chimney To make an installation through a factory built chimney, run a

Page 18

Eco-65 Installation and Operation Manual 22 4.5.5 Through an Existing Masonry Fireplace 1. Position stove, following clearances shown in Section

Page 19

Eco-65 Installation and Operation Manual 23 4.5.6 Through an Existing Masonry Chimney 1. Position stove following clearances shown in Section 3

Page 20

Eco-65 Installation and Operation Manual 24 PART B - OPERATION 4.6 General Information 4.7 Operation Warnings, Cautions and Recommendations  KE

Page 21

Eco-65 Installation and Operation Manual 25  THE VIEWING DOOR MUST BE CLOSED AND LATCHED AT ALL TIMES DURING OPERATION. THE ASH DRAWER ACCESS P

Page 22 - 12”-18”

Eco-65 Installation and Operation Manual 26  THE STOVE WILL NOT OPERATE DURING A POWER OUTAGE. IF AN OUTAGE DOES OCCUR, CHECK THE STOVE FOR SMOK

Page 23

Eco-65 Installation and Operation Manual 27 4.7.1 Zone Heating and How to Make It Work for You Your new pellet stove is a space heater, which mea

Page 24 - PART B - OPERATION

Eco-65 Installation and Operation Manual 28 4.8.2 Where to Store Bags of Pellets We recommend that you store your bags of pellets in a dry and we

Page 25

Eco-65 Installation and Operation Manual 29 Control panel screen Operation mode : OFF MANUAL THERMOSTAT:Thermostatic control (optional)Butt

Page 26

Eco-65 Installation and Operation Manual 3 Table of contents 1 Introduction ...

Page 27 -

Eco-65 Installation and Operation Manual 30 5.1.2 Fuel Feed Button When the “Fuel Feed” button is pushed the stove will feed pellets continuous

Page 28 - 5 Stove Controls

Eco-65 Installation and Operation Manual 31 5.2 Adjustments 5.2.1 Selecting the Combustion Level (Heat Rate) The heat input of the stove varies b

Page 29

Eco-65 Installation and Operation Manual 32 6.2 Everyday Startup Before starting the stove, make sure there is enough pellets in the hopper and th

Page 30

Eco-65 Installation and Operation Manual 33 To use this mode, the button must be pushed to “Thermostat” upon starting the stove. The heat settin

Page 31 - 6 Stove Operation

Eco-65 Installation and Operation Manual 34 maintenance has been done properly. Press the and the buttons and hold simultaneously for 2 second

Page 32 - 6.5 Shutting Down Procedure

Eco-65 Installation and Operation Manual 35 7 Maintenance 7.1 Stove Maintenance 7.1.1 Recommended Maintenance Schedule Use this as a guide when u

Page 33 - and

Eco-65 Installation and Operation Manual 36 OR OTHERWISE LOCALLY DISPERSED, THEY SHOULD BE RETAINED IN THE CLOSED CONTAINER UNTIL ALL CINDERS HAVE

Page 34

Eco-65 Installation and Operation Manual 37 Using the provided sweeping rod, sweep up and down each exchanger. Make sure you go all the way down t

Page 35 - 7 Maintenance

Eco-65 Installation and Operation Manual 38 1) Open the door and turn the lock (A) that can be found above the door opening. 2) Once the baffl

Page 36

Eco-65 Installation and Operation Manual 39 4) Take out the baffle from the combustion chamber. IT IS HIGHLY RECOMMENDED TO CLEAN THE EXHAUST CH

Page 37

Eco-65 Installation and Operation Manual 4 7 Maintenance ...

Page 38

Eco-65 Installation and Operation Manual 40 Using a Philips or Robertson screwdriver, remove both clean-out traps by unlocking them. Push the scre

Page 39

Eco-65 Installation and Operation Manual 41 7.1.4 Cleaning the Burn Pot The burn pot must remain clean and the holes should not be obstruct

Page 40

Eco-65 Installation and Operation Manual 42 2. The burn pot simply sits onto the air intake channel. You must lift to remove it from the stove. T

Page 41

Eco-65 Installation and Operation Manual 43 Verify that the clean out trap gasket is still in good condition, replace it if needed (3/16’’ black

Page 42

Eco-65 Installation and Operation Manual 44 WARNING: ASH PAN MUST BE IN PLACE AND THE ASH PAN ACCESS DOOR MUST BE KEPT CLOSED AT ALL TIMES WHEN TH

Page 43

Eco-65 Installation and Operation Manual 45 7.1.9 Door Gasket Maintenance It is important to maintain the door gasket in good condition. After a

Page 44

Eco-65 Installation and Operation Manual 46 7.2 Venting System Maintenance CAUTION: REGULARLY EXAMINE THE VENTING SYSTEM, THE JOINTS, AND THE SEA

Page 45

Eco-65 Installation and Operation Manual 47 8 Troubleshooting When you have issues with your stove, your first reaction may be to call technical s

Page 46

Eco-65 Installation and Operation Manual 48 8.2 Testing a Component If you suspect that an electrical component to be defective, you can test it

Page 47 - 8 Troubleshooting

Eco-65 Installation and Operation Manual 49 Push the control key to proceed. The frequency of the power source is displayed. Push any control ke

Page 48 - 8.2 Testing a Component

Eco-65 Installation and Operation Manual 5 1 Introduction 1.1 About Pellet Heating Pellet stoves offer a dramatic improvement in the convenience

Page 49

Eco-65 Installation and Operation Manual 50 Displays the temperature read by the thermistor. Push any control key to proceed. Convection blower te

Page 50

Eco-65 Installation and Operation Manual 51 8.3 Main Error Codes, Possible Causes and Solutions WARNING: RISK OF ELECTRICAL SHOCK. IF YOU NEED TO

Page 51

Eco-65 Installation and Operation Manual 52 ALARM CODES CHART MESSAGE CORRESPONDING WARNING Pressure switch warning. Warning caused by the autom

Page 52

Eco-65 Installation and Operation Manual 53 8.3.1 P Code STOVE SHUTS OFF AND APPEARS ON CONTROL BOARD Possible Causes: Possible Remedies: (Unpl

Page 53

Eco-65 Installation and Operation Manual 54 check fuse F4 and F5 on the control board. A defective fuse will be darkened or will have a broken fil

Page 54

Eco-65 Installation and Operation Manual 55 4. The stove needs maintenance. Refer to Section 7: Maintenance. 5. The burn pot is not installed p

Page 55

Eco-65 Installation and Operation Manual 56 THIS PELLET STOVE IS EQUIPED WITH MULTIPLE DEVICES TO ENSURE YOUR SAFETY. IF A WARNING ERROR CODE STOP

Page 56

Eco-65 Installation and Operation Manual 57 8.3.3 E Code STOVE SHUTS OFF AND DISPLAYS WARNING CODE Possible Causes: Possible Remedies: (Unplug

Page 57

Eco-65 Installation and Operation Manual 58 that could have caused a jam. Clean the auger housing thoroughly to remove all pellet dust. 5. The

Page 58

Eco-65 Installation and Operation Manual 59 HOPPER AUGER A Screws B Auger and motor assembly C gasket BURN POT AUGER A Screws B Auger and mot

Page 59

Eco-65 Installation and Operation Manual 6 1.2 Eco-65 Specifications Fuel Type Wood pellets Test Standards (safety) ULC S627, ASTM E1509 and UL

Page 60

Eco-65 Installation and Operation Manual 60 8.3.4 L Code STOVE FEEDS PELLETS, BUT WILL NOT IGNITE AND APPEARS ON THE CONTROL BOARD Possible Cau

Page 61

Eco-65 Installation and Operation Manual 61 to keep the exhaust temperature high enough. To resolve the situation increase feed rate or replace th

Page 62

Eco-65 Installation and Operation Manual 62 8.3.6 N Code THE STOVE FUNCTIONS BUT DISPLAYS WARNING CODE Possible Cause: Possible Remedy:1. A re

Page 63

Eco-65 Installation and Operation Manual 63 8.3.9 A Code STOVE FEEDS PELLETS, BUT WILL NOT IGNITE AND APPEARS ON THE CONTROL BOARD Possi

Page 64

Eco-65 Installation and Operation Manual 64 2. The wiring harness shorted. Make sure the auger motor wiring is properly connected and not shorte

Page 65

Eco-65 Installation and Operation Manual 65 8.3.11 Auger Motor Stops Momentarily AUGER MOTOR STOP FEEDING PELLETS AND COMES BACK ON Possible Cause

Page 66

Eco-65 Installation and Operation Manual 66 filled the tube around the igniter. Refer to Section 7: Maintenance. Also, make sure that recommended

Page 67 - 9 Wiring Diagram

Eco-65 Installation and Operation Manual 67 9 Wiring Diagram

Page 68 - 10 Access to Fuses

Eco-65 Installation and Operation Manual 68 10 Access to Fuses WARNING: UNPLUG THE STOVE BEFORE CHANGING THE FUSES. All fuses are located inside

Page 69

Eco-65 Installation and Operation Manual 69 LETTER FUSE FUNCTION AMPERAGE A MAIN BOARD FUSE 7.5A B CONVECTION BLOWER 5A C COMBUSTION BLOWER 3A

Page 70 - 11 Components Location

Eco-65 Installation and Operation Manual 7 1.3 Overall Exterior Dimensions A FRESH AIR INLET B EXHAUST

Page 71 - 12 Blower Replacement

Eco-65 Installation and Operation Manual 70 11 Components Location LETTER COMPONENT A HEAT EXCHANGER TUBES B BURN POT C IGNITOR D C

Page 72

Eco-65 Installation and Operation Manual 71 12 Blower Replacement CONVECTION BLOWER Unscrew screw A (1), slightly pivot the fan upward then parti

Page 73

Eco-65 Installation and Operation Manual 72 COMBUSTION BLOWER Remove the 9 screws (A) and the bottom grille (B). Unlatch the clamps (C). Remove t

Page 74 - Remove the clamp (D)

Eco-65 Installation and Operation Manual 73 EXHAUST BLOWER Remove the left panel. Unplug the connections (A) and (B). Unplug the silicone tu

Page 75

Eco-65 Installation and Operation Manual 74 Remove the clamp (D). With a Philips screwdriver, unlock and remove the access panel (E).

Page 76

Eco-65 Installation and Operation Manual 75 Remove the nuts (F) located in the opening of the trapdoor. Remove the duct assembly (G).

Page 77

Eco-65 Installation and Operation Manual 76 Remove the bolts (H) and nuts (I) to remove the exhaust blower (J)

Page 78

Eco-65 Installation and Operation Manual 77 13 L-250 and F-160 Thermal Switch Replacement L-250 1. Remove both retaining screws (A) holding the

Page 79

Eco-65 Installation and Operation Manual 78 Remove the faulty thermal switch. Replace new thermal switch (D) underneath the bracket (B) by means o

Page 80 - SECTION B

Eco-65 Installation and Operation Manual 79 14 Exploded View and Replacement Parts SECTION A

Page 81 - SECTION C

Eco-65 Installation and Operation Manual 8 PART A – INSTALLATION 2 Installation Safety Information 2.1 Installation Warnings, Cautions and Recom

Page 82

Eco-65 Installation and Operation Manual 80 SECTION B

Page 83

Eco-65 Installation and Operation Manual 81 SECTION C

Page 84

Eco-65 Installation and Operation Manual 82 SECTION D SECTION E

Page 85

Eco-65 Installation and Operation Manual 83 SECTION F SECTION G

Page 86

Eco-65 Installation and Operation Manual 84 SECTION H SECTION I

Page 87

Eco-65 Installation and Operation Manual 85 SECTION J

Page 88

Eco-65 Installation and Operation Manual 86 IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your stove, ple

Page 89

Eco-65 Installation and Operation Manual 87 # Item Description Qty 36 30799 STEEL ROUND KNOB, 3/8"-16 THREADED 1 37 30800 FULLY THREA

Page 90

Eco-65 Installation and Operation Manual 88 # Item Description Qty 77 PL64459 MOTHER BOARD HOUSING COVER 1 78 49006 3/8'' X 24&q

Page 91

Eco-65 Installation and Operation Manual 89 APPENDIX A: HORIZONTAL AND VERTICAL VENT CHART Possible Vertical vent length (feet) Possible Horiz

Page 92 - Thermostat location

Eco-65 Installation and Operation Manual 9  DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTEM OF THIS UNIT.  DO NOT CONNECT THIS STOV

Page 93 - Wired thermostat

Eco-65 Installation and Operation Manual 90 Instead, if the installation consisted of a horizontal vent coming out at the back of the stove on a t

Page 94 - Wireless thermostat

Eco-65 Installation and Operation Manual 91 APPENDIX B: FLAME CARACTERISTICS Efficient flame An efficient flame should be bright but not too vigor

Page 95

Eco-65 Installation and Operation Manual 92 APPENDIX C: INSTALLING A THERMOSTAT (AC05558) Using a thermostat will help you maintain a constant tem

Page 96

Eco-65 Installation and Operation Manual 93 Wired thermostat Before installing the thermostat, unplug the power cord from the power outlet. First,

Page 97

Eco-65 Installation and Operation Manual 94 Wireless thermostat If you are using a wireless thermostat or a hand held thermostatic remote control,

Page 98

Eco-65 Installation and Operation Manual 95 APPENDIX D: MOBILE HOME INSTALLATION Anchor the stove WARNING: FOR MOBILE HOME INSTALLATION, IT IS MAN

Page 99

Eco-65 Installation and Operation Manual 96 A Fresh air intake B Tee C Pellet pipe length and/or slip section D Ceiling support E Attic insulatio

Page 100 - (AC01330)

Eco-65 Installation and Operation Manual 97 APPENDIX E: COMBUSTION AIR SUPPLY WARNING: FOR MOBILE HOME INSTALLATION, IT IS MANDATORY TO CONNECT TH

Page 101

Eco-65 Installation and Operation Manual 98 To complete the installation, make a hole of1/4" to 1/2" (6 mm à 13 mm) bigger than the insu

Page 102

Eco-65 Installation and Operation Manual 99 Sources of Outside Combustion Air WARNING: IT IS FORBIDDEN TO DRAW COMBUSTION AIR FROM A BASEMENT, AN

Commentaires sur ces manuels

Pas de commentaire